英语资讯
News

英语文摘:China, Iran sign contract on redesign of Arak heavy water reactor

Source: Xinhuanet    2017-04-24  我要投稿   论坛   Favorite  

VIENNA, April 23 (Xinhua) -- China and Iran signed the first commercial contract to redesign Iran's Arak heavy water reactor in Vienna on Sunday.

The commercial contract signed between the two sides is seen as an important step towards modification of the Arak heavy water reactor.

Under the Joint Comprehensive Plan of Action (JCPOA), Iran agreed to redesign the reactor to minimize its plutonium production and avoid production of weapons-grade plutonium.

Redesigning the Arak heavy water reactor is a core aspect of the JCPOA on Iran's nuclear program.

The JCPOA was reached in Vienna in July 2015 between Iran and the P5+1 group, namely Britain, China, France, Russia, the United States and Germany.

The P5+1 countries have created a working group led by China and the United States to work with Iran to redesign the reactor.

Iranian ambassador to the International Atomic Energy Agency (IAEA) Reza Najafi told Xinhua the signing of the contract is important and Iran has very good cooperation with China. He said it's the example cooperation which the other sides should learn from.


将本页收藏到:
上一篇:英语文摘:Chinese FM hails Sino-Greek civilization exchanges, mutual learning
下一篇:英语文摘:China, Africa enhance cooperation in health
最新更新
论坛精彩内容
网站地图 - 学习交流 - 恒星英语论坛 - 关于我们 - 广告服务 - 帮助中心 - 联系我们
Copyright ©2006-2007 www.Hxen.com All Rights Reserved