The successful insertion of the 4-inch tube into a 21-inch riser pipe that once connected the rig with an underwater well followed BP's two failed attempts to insert a mile-long tube.
Preparations for an attempt to inject mud into the well to stop the leak permanently were ongoing and would be completed in seven to 10 days, Wells said.
将本页收藏到:
上一篇:英语文摘:Israeli minister warns against further delay in Mideast peace talks
下一篇:英语文摘:Death toll in Thai clashes rises to 35